7.15. Building Information Modeling (BIM)

7.15. Building Information Modeling (BIM)

Building Information Modeling covers the object-based digital representation of a building and the data-centric workflows built around it: authoring and parametric modeling, multidisciplinary coordination, construction and facilities-management integration, and the standards, regulations, and emerging AI-driven automation that govern BIM practice across a project's full lifecycle - from early design through construction, operation, heritage documentation, and infrastructure.

Knowledge Area (KA) Core
Tier1
Core
Tier2
 7.15.1 BIM Fundamentals and Authoring 11
 7.15.2 Parametric Modeling and Visual Scripting for BIM 11
 7.15.3 Multidisciplinary Model Coordination 11
 7.15.4 4D BIM and Construction Scheduling 11
 7.15.5 5D BIM and Cost Estimation 11
 7.15.6 BIM for Structural and MEP Coordination 11
 7.15.7 BIM for Sustainability Analysis 11
 7.15.8 BIM for Facilities Management 11
 7.15.9 BIM Execution Planning and Standards 11
 7.15.10 Collaborative BIM Workflows 11
 7.15.11 Heritage BIM (HBIM) 11
 7.15.12 BIM for Infrastructure and Urban Modeling 11
 7.15.13 AI-Assisted BIM Automation 11
 7.15.14 BIM Standards, Policy, and Contracts 11
 7.15.15 BIM-Based Construction Documentation 11
 7.15.16 BIM Model Organization and Worksharing 11
 7.15.17 Generative Design and Optioneering 11
 7.15.18 Model-Based Issue and RFI Management 11
 7.15.19 BIM Across Project Delivery Methods 11
 7.15.20 Lean Construction and 4D BIM Integration 11
 7.15.21 Fabrication-Level BIM Detailing 11
 7.15.22 BIM Model Quality Control and Auditing 11
 7.15.23 BIM for Circular Economy and Material Reuse 11
 7.15.24 BIM-Supported Green Building Certification 11
 7.15.25 Operational Digital Twins from BIM 11
 7.15.26 Asset Classification and Data Standards for FM 11
 7.15.27 Reality Capture for BIM: Point Clouds and Photogrammetry 11
 7.15.28 Integrated BIM Project Delivery (Capstone) 11
 7.15.29 Emerging Trends in BIM Practice Elective
 7.15.30 BIM Software Practicum 11
Table 7.15: List of KUs in the Building Information Modeling area.

7.15.1. BIM/BIM Fundamentals and Authoring  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the foundational concepts of Building Information Modeling: object-based parametric modeling, authoring tools, level of development (LOD), and open data-exchange standards.
Topics:
Core

  • Core BIM concepts: object-oriented modeling (walls, doors, windows with embedded data), parametric relationships (hosting, constraints), and the difference between BIM and conventional 2D/3D modeling
  • BIM authoring tools: Revit (project-based, family editor), ArchiCAD (virtual building model), Vectorworks, and their respective modeling philosophies and interoperability
  • Level of development (LOD) specification: LOD 100 (conceptual), 200 (schematic), 300 (detailed), 350 (construction-ready), 400 (fabrication), 500 (as-built)
  • Data exchange standards: Industry Foundation Classes (IFC) as openBIM exchange format, IFC schema (IfcWall, IfcDoor, IfcWindow, IfcSpace), and vendor-neutral model interoperability

Learning Outcomes:
Core:

  1. Describe the core concepts of BIM: object-based modeling, parametric relationships, LOD, and data exchange via IFC, and explain how BIM differs from traditional 2D CAD [Familiarity]
  2. Develop a BIM model of a small building at LOD 200-300, producing plans, sections, elevations, and a simple schedule directly from the model, and export the model to IFC format [Usage]
  3. Evaluate a BIM model for appropriate LOD, correct parametric relationships, and clean IFC export, identifying modeling errors that would impede downstream coordination or data exchange [Assessment]

7.15.2. BIM/Parametric Modeling and Visual Scripting for BIM  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the authoring of parametric BIM content and the use of visual programming to extend and automate BIM authoring tools beyond their standard interface.
Topics:
Core

  • Parametric family and component authoring: creating custom BIM families with parametric constraints, formulas, and type/instance parameters (Revit families, ArchiCAD GDL objects)
  • Adaptive and generative components: adaptive component modeling for non-standard geometry, nested and shared parameters, and parametric array/pattern-based component placement
  • Visual programming for BIM automation: Dynamo and Grasshopper-to-Revit workflows for geometry generation, data extraction, and model auditing

Non Core

  • Integrating computational design with BIM: round-tripping geometry between parametric-design environments and BIM authoring tools, and managing model complexity and file size

Learning Outcomes:
Core:

  1. Describe the difference between a standard BIM family or component and a parametric or adaptive one, and identify when visual scripting is an appropriate tool for a BIM modeling task [Familiarity]
  2. Author a parametric family or component with meaningful parametric constraints, and use a visual-scripting tool to automate a repetitive BIM modeling or data-extraction task [Usage]
  3. Evaluate a parametric BIM family or visual script for robustness, reusability, and appropriateness to the design problem it addresses [Assessment]

7.15.3. BIM/Multidisciplinary Model Coordination  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the coordination of federated, multidisciplinary BIM models to identify and resolve conflicts before construction, and the shared data environment that governs model and document exchange.
Topics:
Core

  • BIM coordination and clash detection: federated model assembly, hard and soft clash detection in Navisworks or Solibri, clash resolution workflows, and the reduction of RFIs
  • IFC and open BIM standards: the IFC schema for vendor-neutral model exchange, BCF (BIM Collaboration Format) for issue tracking, and openBIM coordination workflows across authoring platforms
  • Common Data Environment (CDE): shared, work-in-progress, published, and archive states for model and document management; naming conventions and version control in a multi-party project

Learning Outcomes:
Core:

  1. Describe the role of model coordination in a multidisciplinary project, including federated models, clash detection, and the Common Data Environment [Familiarity]
  2. Apply BIM coordination tools to detect and resolve clashes in a federated building model, documenting issues through a Common Data Environment workflow [Usage]
  3. Evaluate a model-coordination protocol for a construction project, assessing federation strategy, clash-detection coverage, and CDE governance [Assessment]

7.15.4. BIM/4D BIM and Construction Scheduling  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the integration of BIM elements with construction schedules to simulate, communicate, and review the sequencing of construction work over time.
Topics:
Core

  • 4D BIM and construction scheduling: linking BIM elements to Gantt chart activities in Synchro or Navisworks TimeLiner
  • Construction sequencing simulation: visualizing phased construction, logistics, and site congestion through 4D animation for stakeholder communication and constructability review

Learning Outcomes:
Core:

  1. Describe the concept of 4D BIM and explain how linking model elements to schedule activities supports construction planning and communication [Familiarity]
  2. Link a BIM model's elements to a construction schedule to produce a 4D sequencing simulation for a building project [Usage]
  3. Evaluate a 4D construction sequencing simulation for its accuracy, clarity, and usefulness in identifying logistics or site-congestion problems [Assessment]

7.15.5. BIM/5D BIM and Cost Estimation  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the extraction of quantities from a BIM model and their use for real-time, model-linked cost estimation throughout the design and construction process.
Topics:
Core

  • Model-based quantity takeoff and cost estimation: automated schedule extraction from BIM elements, level of development (LOD) requirements for cost estimation
  • 5D cost modeling: linking BIM quantities to unit costs for real-time budget tracking across design iterations, and change-order cost impact analysis

Learning Outcomes:
Core:

  1. Describe how BIM-based quantity takeoff supports cost estimation, and explain the relationship between model LOD and estimate accuracy [Familiarity]
  2. Extract quantities from a BIM model and link them to unit costs to produce a model-based cost estimate for a design option [Usage]
  3. Evaluate a 5D cost model for completeness and accuracy, identifying quantities that are missing, duplicated, or misclassified [Assessment]

7.15.6. BIM/BIM for Structural and MEP Coordination  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the use of BIM to coordinate the architectural model with structural analysis software and MEP (mechanical, electrical, plumbing) systems routing.
Topics:
Core

  • BIM-based structural workflows: structural analysis model from architectural BIM (Revit, Tekla), data exchange via IFC or CIS/2
  • MEP systems coordination in BIM: routing and clash-avoidance for HVAC ducts, plumbing, and electrical conduit within a federated model; spatial coordination with structural and architectural elements

Learning Outcomes:
Core:

  1. Describe the BIM-based workflow for exchanging a model between architectural, structural, and MEP software, and explain the role of IFC/CIS2 in that exchange [Familiarity]
  2. Coordinate a federated model's structural and MEP elements, identifying and resolving spatial conflicts between systems [Usage]
  3. Evaluate a structural/MEP-coordinated BIM model for spatial conflicts, data-exchange integrity, and coordination completeness [Assessment]

7.15.7. BIM/BIM for Sustainability Analysis  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the use of BIM models as the data source for energy, daylight, and material-sustainability analysis throughout the design process.
Topics:
Core

  • BIM-integrated energy analysis: gbXML export from BIM authoring tools to energy-simulation engines, and iterative design-stage energy performance feedback
  • BIM-integrated daylight and solar analysis: linking BIM massing and material data to daylight simulation (Insight, IES-VE) and solar-access studies

Non Core

  • Embedding sustainability data in BIM objects: embodied-carbon data (EPDs) and material-passport information attached to BIM elements for lifecycle assessment

Learning Outcomes:
Core:

  1. Describe how BIM models can be exported or linked to energy, daylight, and sustainability-analysis tools, and explain the data requirements for each [Familiarity]
  2. Export a BIM model's geometry and material data to run an energy or daylight analysis, and use the results to inform a design iteration [Usage]
  3. Evaluate a BIM-based sustainability analysis for data accuracy and the appropriateness of its design recommendations [Assessment]

7.15.8. BIM/BIM for Facilities Management  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the handover of a construction BIM model into a facilities-management and operations environment, and its evolution into an operational digital twin.
Topics:
Core

  • BIM handover and facilities management: COBie data for asset management, as-built BIM models, digital twin seeding from construction BIM

Learning Outcomes:
Core:

  1. Describe the BIM-to-FM handover process, including COBie data requirements and the role of as-built models in facilities management [Familiarity]
  2. Prepare a COBie data set and as-built BIM model for handover to a facilities-management team [Usage]
  3. Evaluate a BIM-to-FM handover package for completeness and usability, identifying missing asset data or model discrepancies [Assessment]

7.15.9. BIM/BIM Execution Planning and Standards  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the planning documents and international standards that define how BIM is used, exchanged, and governed across a project team.
Topics:
Core

  • BIM Execution Plan (BEP): project goals for BIM use (clash detection, 4D/5D, facility management), LOD matrix by discipline, model sharing protocols
  • ISO 19650 framework: information management using BIM across the delivery and operational phases of assets, information requirements (EIR, OIR, AIR), and the information-delivery cycle

Learning Outcomes:
Core:

  1. Describe the purpose of a BIM Execution Plan and the ISO 19650 information-management framework, and explain how they structure a project's BIM deliverables [Familiarity]
  2. Draft a BIM Execution Plan for a project, specifying BIM goals, LOD matrix, and information-delivery milestones aligned with ISO 19650 [Usage]
  3. Evaluate a BIM Execution Plan for a design project, assessing its LOD specifications, exchange protocols, and BIM use cases for adequacy and clarity [Assessment]

7.15.10. BIM/Collaborative BIM Workflows  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the collaborative, cloud-based workflows that let multiple disciplines work on a shared BIM model in real time.
Topics:
Core

  • BIM collaboration: federated models, clash detection and resolution, model-based quantity takeoff for estimating
  • Cloud-based BIM collaboration platforms: real-time multi-user editing (BIM 360/ACC, BIMcloud, Trimble Connect), permissions, and worksharing

Learning Outcomes:
Core:

  1. Describe how cloud-based BIM collaboration platforms support real-time, multi-user, multidisciplinary model development [Familiarity]
  2. Develop a BIM collaboration protocol for a project, specifying model sharing standards, clash detection frequency, and meeting rhythms [Usage]
  3. Evaluate a project's BIM collaboration setup for its effectiveness in supporting multidisciplinary, real-time teamwork [Assessment]

7.15.11. BIM/Heritage BIM (HBIM)  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the adaptation of Building Information Modeling for heritage documentation and management: Heritage BIM (HBIM), parametric modeling of historic elements, and digital twins for conservation planning and monitoring.
Topics:
Core

  • Heritage BIM (HBIM): object-oriented modeling of historic buildings using non-parametric (discrete) and parametric libraries
  • Scan-to-BIM workflow: processing point clouds from laser scanning to create 3D models with semantic decomposition (walls, vaults, windows)
  • Semantic enrichment for heritage: adding conservation data (material type, decay grade, past interventions, monitoring history) to BIM objects
  • Digital twins for heritage: integrating real-time monitoring sensors (cracks, displacement, humidity, temperature) with HBIM

Non Core

  • HBIM standards and guidelines: ICOMOS HBIM Guidelines, CIDOC CRM for cultural heritage data, and the integration of HBIM with conservation management plan data fields

Learning Outcomes:
Core:

  1. Describe the concept of Heritage BIM (HBIM) and explain how it differs from conventional BIM in terms of geometry representation and semantic data [Familiarity]
  2. Create an HBIM model of a historic building element (vault, window, wall) from laser scan data, enriching it with semantic data (material, decay condition, past interventions) [Usage]
  3. Evaluate a proposed HBIM workplan for a heritage project, assessing the level of detail required for documentation and the compatibility of data schema with monitoring needs [Assessment]

7.15.12. BIM/BIM for Infrastructure and Urban Modeling  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the extension of BIM methods beyond vertical buildings to horizontal/civil infrastructure and city-scale urban information models.
Topics:
Core

  • BIM for horizontal/civil infrastructure: roads, bridges, and utility networks modeled with alignment-based and corridor-modeling tools (Civil 3D, InfraWorks), distinct from vertical-building BIM authoring
  • City Information Modeling (CIM) and urban digital twins: integrating building-scale BIM with city-scale GIS data (CityGML, 3D Tiles) for planning and infrastructure coordination

Learning Outcomes:
Core:

  1. Describe how BIM methods extend to horizontal infrastructure and city-scale modeling, and identify the tools and data standards specific to each scale [Familiarity]
  2. Model a piece of infrastructure (road segment, utility corridor) using alignment-based BIM tools, and integrate it with an urban-scale GIS dataset [Usage]
  3. Evaluate an infrastructure or city-information model for data interoperability between building-scale BIM and city-scale GIS systems [Assessment]

7.15.13. BIM/AI-Assisted BIM Automation  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the use of artificial intelligence and scripted automation to generate, check, and optimize BIM content and workflows.
Topics:
Core

  • AI-assisted BIM automation: generative design for structural and MEP routing, automated code compliance checking, NLP-based specification extraction
  • BIM automation and scripting: automating repetitive tasks (door and window schedules, room data sheets), generative layout for bathrooms and parking

Non Core

  • AI-assisted code compliance checking: NLP for parsing building-code provisions, automated rule checking of BIM models against applicable codes

Learning Outcomes:
Core:

  1. Describe how AI and scripted automation can generate, check, and optimize BIM content, and identify tasks that are good candidates for automation [Familiarity]
  2. Automate a repetitive BIM task (schedule generation, code-compliance check, or layout generation) using a scripted or AI-assisted tool [Usage]
  3. Evaluate an AI-assisted or scripted BIM automation tool for its accuracy, reliability, and actual time savings over manual methods [Assessment]

7.15.14. BIM/BIM Standards, Policy, and Contracts  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the policy frameworks that mandate or incentivize BIM adoption, and the contractual mechanisms that allocate risk, authorship, and liability for shared model data.
Topics:
Core

  • National and regional BIM adoption mandates: policy frameworks requiring BIM on public infrastructure projects (e.g. Peru's Plan BIM Perú, UK BIM Mandate, EU BIM Task Group), and their implications for permit submission and interdisciplinary coordination
  • BIM in contracts and risk allocation: BIM Execution Plans as contract exhibits, model-authorship and liability clauses, and intellectual-property considerations for shared model data

Learning Outcomes:
Core:

  1. Describe the major national and international BIM policy frameworks, and explain how BIM Execution Plans and authorship clauses are used to allocate contractual risk [Familiarity]
  2. Identify the BIM mandate or policy applicable to a given project's jurisdiction, and draft a contract clause addressing model authorship and liability [Usage]
  3. Evaluate a project's compliance with applicable BIM mandates and the adequacy of its contractual provisions for model authorship and liability [Assessment]

7.15.15. BIM/BIM-Based Construction Documentation  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the production of a complete construction documentation set directly from a BIM model: sheet and view organization, schedules, and model-derived export formats.
Topics:
Core

  • Sheet and view setup from the model: plan, section, elevation, and detail views generated directly from the BIM model, view templates, and view-specific graphic overrides
  • Automated schedule generation: door, window, room finish, and area schedules extracted live from model data, and their coordination with drawing sheets
  • Model-based annotation and tagging: dimension strings, keynotes, and tags linked to model elements so they update automatically when the model changes

Non Core

  • Export formats for documentation delivery: PDF sets, DWG export for consultants without BIM authoring tools, and print/plot configuration for a full drawing set

Learning Outcomes:
Core:

  1. Describe how a construction documentation set (plans, sections, elevations, schedules) is produced directly from a BIM model rather than drawn separately [Familiarity]
  2. Produce a coordinated set of sheets, views, and schedules from a BIM model, keeping annotations and tags linked to model elements [Usage]
  3. Evaluate a model-derived documentation set for completeness, internal consistency, and readiness for permit submission or construction [Assessment]

7.15.16. BIM/BIM Model Organization and Worksharing  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the internal organization of a BIM project file and the worksharing mechanics that let a team edit the same model concurrently.
Topics:
Core

  • Project templates and file structure: starting templates, worksets, linked vs. inserted models, and project browser organization
  • Naming and numbering conventions for models, sheets, and views, aligned with a project's BIM Execution Plan
  • Worksharing mechanics: central/local file models, element ownership and borrowing, sync-with-central workflow, and conflict resolution between team members

Learning Outcomes:
Core:

  1. Describe how a BIM project file is structured into worksets, links, and templates, and how multiple team members edit it concurrently through worksharing [Familiarity]
  2. Set up a BIM project's worksets, naming conventions, and linked models for a multi-person team, and resolve a worksharing conflict [Usage]
  3. Evaluate a BIM project's file organization and worksharing setup for consistency with its naming conventions and its ability to support concurrent editing [Assessment]

7.15.17. BIM/Generative Design and Optioneering  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the use of parametric and algorithmic methods to generate and compare multiple design options against quantifiable performance criteria.
Topics:
Core

  • Generating design option sets through parametric variation of a model's driving dimensions, and organizing them for systematic comparison
  • Performance-driven generative design: coupling a parametric model to a fitness metric (area efficiency, daylight, structural weight) via optimization plug-ins (Galapagos, Octopus)

Non Core

  • Multi-objective optimization trade-offs: Pareto fronts for competing criteria, and interpreting optimization results for design decision-making

Learning Outcomes:
Core:

  1. Describe how generative design couples a parametric model to a performance metric to produce and compare design options [Familiarity]
  2. Set up a parametric model and an optimization plug-in to generate a set of design options against a chosen performance metric [Usage]
  3. Evaluate a generative-design option set for the validity of its performance metric and the appropriateness of the selected design option [Assessment]

7.15.18. BIM/Model-Based Issue and RFI Management  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the tracking and resolution of design and construction issues through model-linked workflows, from clash markups to formal requests for information.
Topics:
Core

  • BCF (BIM Collaboration Format)-based issue tracking: creating, assigning, and closing model-linked issues across authoring platforms
  • Model-based requests for information (RFIs): linking an RFI to specific model elements and views, and tracking its resolution back into the model
  • Submittal tracking tied to model elements: linking product data and shop-drawing submittals to the BIM elements they specify

Learning Outcomes:
Core:

  1. Describe how BCF-based issue tracking, model-based RFIs, and submittal tracking keep design and construction issues linked to specific model elements [Familiarity]
  2. Create, assign, and track a set of model-linked issues through BCF, and link a submittal or RFI to the model elements it affects [Usage]
  3. Evaluate a project's model-based issue log for traceability, timely resolution, and completeness of the links between issues and model elements [Assessment]

7.15.19. BIM/BIM Across Project Delivery Methods  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers how different project delivery and procurement methods shape BIM use, responsibility, and maturity across a project's life.
Topics:
Core

  • Project delivery methods and their effect on BIM responsibility: Design-Bid-Build, Design-Build, Construction Management at Risk, and Integrated Project Delivery (IPD)
  • BIM maturity levels (Level 0-3): from unmanaged CAD to fully collaborative, cloud-based, integrated BIM, and how procurement choice shapes the achievable level

Non Core

  • Risk- and reward-sharing models in IPD and alliance contracts, and their relationship to shared BIM model responsibility

Learning Outcomes:
Core:

  1. Describe how different project delivery methods assign BIM responsibility differently, and explain the BIM maturity level framework [Familiarity]
  2. Recommend a project delivery method and target BIM maturity level appropriate for a given project's scale and ownership structure [Usage]
  3. Evaluate a project's chosen delivery method for whether it supports the BIM maturity level the project actually requires [Assessment]

7.15.20. BIM/Lean Construction and 4D BIM Integration  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the integration of Lean Construction planning methods with 4D BIM scheduling to reduce waste and improve the reliability of construction sequencing.
Topics:
Core

  • Last Planner System: pull planning, weekly work plans, and percent-plan-complete (PPC) tracking, and its integration with a 4D BIM schedule
  • Collaborative pull-planning sessions using 4D BIM visualizations to sequence trade work and identify constraints before they cause delay

Non Core

  • Lean waste-reduction principles (overproduction, waiting, rework) applied to BIM-coordinated construction workflows

Learning Outcomes:
Core:

  1. Describe the Last Planner System and explain how linking it to a 4D BIM schedule improves the reliability of construction sequencing [Familiarity]
  2. Run a pull-planning exercise supported by a 4D BIM visualization, producing a weekly work plan and identifying constraints [Usage]
  3. Evaluate a Lean-BIM construction plan for its percent-plan-complete tracking and its effectiveness at surfacing constraints before they cause delay [Assessment]

7.15.21. BIM/Fabrication-Level BIM Detailing  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the development of structural and MEP BIM models to fabrication-level detail (LOD 400) for shop drawings and prefabrication.
Topics:
Core

  • Structural fabrication detailing: connection design, rebar detailing, and steel/precast shop-drawing-level modeling (Tekla, Advance Steel)
  • MEP fabrication modeling: spool drawings for ductwork and piping, prefabrication-ready routing, and hanger/support detailing at LOD 400

Non Core

  • Coordinating fabrication-level models with offsite prefabrication schedules and delivery logistics

Learning Outcomes:
Core:

  1. Describe the difference between a construction-level (LOD 350) and a fabrication-level (LOD 400) structural or MEP model, and identify the detailing each requires [Familiarity]
  2. Develop a structural connection or MEP routing detail to fabrication-level (LOD 400), ready for shop-drawing production [Usage]
  3. Evaluate a fabrication-level BIM model for the completeness and buildability of its connection and routing details [Assessment]

7.15.22. BIM/BIM Model Quality Control and Auditing  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the systematic checking of a BIM model's data integrity, naming compliance, and modeling quality before it is shared or coordinated.
Topics:
Core

  • Model auditing tools and routines: automated checks for unnamed/duplicate elements, orphaned families, and file size/performance issues
  • Parameter and naming-convention validation: checking that model elements carry the required parameters and follow the project's naming standards before federation

Non Core

  • Automated rule-checking scripts (Dynamo, Solibri rulesets) for enforcing modeling standards across a large or multi-author model

Learning Outcomes:
Core:

  1. Describe the kinds of modeling and data errors a BIM quality-control audit is designed to catch, and why they matter before model federation [Familiarity]
  2. Run a model audit on a BIM file, identifying and correcting naming, parameter, and modeling-quality issues before sharing it with the project team [Usage]
  3. Evaluate a model's audit report to judge whether it is ready for federation and coordination, or requires further cleanup [Assessment]

7.15.23. BIM/BIM for Circular Economy and Material Reuse  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the use of BIM data to support circular-economy design decisions: deconstruction planning, material reuse, and end-of-life tracking.
Topics:
Core

  • Design-for-disassembly principles embedded in BIM: reversible connections, material separation, and modeling components for future deconstruction
  • Material passports and material banks: tagging BIM elements with reuse potential, provenance, and end-of-life data for future material recovery

Non Core

  • Deconstruction sequencing and planning using a BIM model, mirroring 4D construction scheduling in reverse

Learning Outcomes:
Core:

  1. Describe how BIM data (material passports, reversible-connection tagging) can support circular-economy design decisions [Familiarity]
  2. Tag a BIM model's elements with material-passport and design-for-disassembly data to support a future deconstruction or reuse scenario [Usage]
  3. Evaluate a BIM-based circular-economy strategy for a project, judging the completeness of its material-passport data and the feasibility of its deconstruction plan [Assessment]

7.15.24. BIM/BIM-Supported Green Building Certification  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the use of BIM model data to track and document compliance with green-building certification systems throughout design and construction.
Topics:
Core

  • Certification credit tracking from model data: linking BIM quantities and performance analysis results to LEED, EDGE, or BREEAM credit requirements
  • Generating certification documentation (narratives, calculations, drawings) directly from BIM model data and schedules

Learning Outcomes:
Core:

  1. Describe how BIM model data can be linked to green-building certification credit requirements and documentation [Familiarity]
  2. Track a chosen set of green-building certification credits against a BIM model's quantities and analysis results [Usage]
  3. Evaluate a BIM-based certification compliance package for completeness and consistency with the model it was generated from [Assessment]

7.15.25. BIM/Operational Digital Twins from BIM  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the evolution of an as-built BIM model into a live operational digital twin through sensor integration and performance monitoring.
Topics:
Core

  • IoT sensor integration with an as-built BIM model: mapping sensor feeds (temperature, occupancy, energy use) to model elements and spaces
  • Predictive-maintenance workflows: using live and historical operational data linked to a digital twin to anticipate equipment failure and schedule maintenance

Non Core

  • Building performance dashboards built on digital-twin data for facilities managers and building owners

Learning Outcomes:
Core:

  1. Describe how an as-built BIM model becomes a live operational digital twin through sensor integration and ongoing data feeds [Familiarity]
  2. Map a set of IoT sensor feeds to an as-built BIM model's spaces and elements, and build a simple performance dashboard from the resulting data [Usage]
  3. Evaluate a building's digital-twin setup for sensor coverage, data quality, and its usefulness for predictive maintenance [Assessment]

7.15.26. BIM/Asset Classification and Data Standards for FM  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the classification systems and data schemas that structure asset information for facilities management, independent of any one software platform.
Topics:
Core

  • Asset classification systems: Uniclass and OmniClass structures for organizing building elements and systems for FM use
  • COBie schema in depth: component, type, system, space, and spare-parts worksheets, and how FM software consumes them

Learning Outcomes:
Core:

  1. Describe how classification systems (Uniclass, OmniClass) and the COBie schema structure asset data for facilities management [Familiarity]
  2. Classify a BIM model's assets using a standard classification system, and populate the corresponding COBie worksheets [Usage]
  3. Evaluate an asset data set for correct classification and COBie schema completeness before FM handover [Assessment]

7.15.27. BIM/Reality Capture for BIM: Point Clouds and Photogrammetry  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the capture and processing of real-world geometry (laser scanning, photogrammetry) into point-cloud and mesh data usable as a BIM modeling reference.
Topics:
Core

  • Laser scanning workflows: terrestrial and handheld scanner data capture, registration of multiple scans, and point-cloud cleanup
  • Photogrammetric reconstruction: structure-from-motion processing of overlapping photographs (drone or handheld) into dense point clouds and textured meshes
  • Working from point-cloud or mesh references inside a BIM authoring tool: underlay referencing, scan-based dimension checking, and as-built verification against design models

Learning Outcomes:
Core:

  1. Describe how laser scanning and photogrammetry capture real-world geometry as point-cloud or mesh data usable inside a BIM authoring tool [Familiarity]
  2. Register a set of scans or photographs into a point cloud, and use it as a reference to verify or model an as-built condition in BIM [Usage]
  3. Evaluate a reality-capture data set for registration accuracy and its adequacy as a reference for as-built BIM modeling [Assessment]

7.15.28. BIM/Integrated BIM Project Delivery (Capstone)  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

Covers the end-to-end integration of authoring, coordination, scheduling/cost, and facilities-management BIM workflows into a single project deliverable.
Topics:
Core

  • Integrating a project's full BIM workflow: authoring, federation and clash resolution, 4D/5D linkage, and FM-ready handover data, delivered as a single coherent package
  • Executing a BIM Execution Plan end to end on a real project deliverable, tracking its stated BIM goals and LOD matrix against what was actually produced

Learning Outcomes:
Core:

  1. Describe how a BIM Execution Plan's stated goals connect authoring, coordination, scheduling/cost, and FM handover into a single integrated project workflow [Familiarity]
  2. Deliver an integrated BIM project package covering authoring, coordination, 4D/5D data, and FM handover, following a stated BIM Execution Plan [Usage]
  3. Evaluate an integrated BIM project deliverable against its own BIM Execution Plan, judging completeness and internal consistency across authoring, coordination, and handover data [Assessment]

7.15.29. BIM/Emerging Trends in BIM Practice Back to top

Surveys emerging research and practice directions that extend BIM beyond its current established workflows.
Topics:
Non Core

  • Urban-scale digital twins combining building BIM, infrastructure BIM, and city-scale sensor networks for planning and resilience analysis
  • Blockchain and distributed-ledger proposals for BIM model provenance, version authenticity, and smart contracts tied to model milestones
  • Convergence of BIM with construction robotics and autonomous site monitoring, extending the AI-assisted automation already covered in BIM.AIAutomation

Learning Outcomes:
NonCore:

  1. Describe two or three emerging research or practice directions that are extending BIM beyond its current established workflows [Familiarity]
  2. Discuss, with supporting evidence, the practical maturity and adoption barriers of one emerging BIM trend [Usage]
  3. Evaluate the likely near-term impact of an emerging BIM trend on professional practice in the student's own context [Assessment]

7.15.30. BIM/BIM Software Practicum  (Core Tier1: 1 hr, Core Tier2: 1 hr) Back to top

A transversal, hands-on software-lab component that recurs across the BIM course sequence: guided exercises and certification-aligned practice in the specific authoring/coordination/analysis tool relevant to each course's theme.
Topics:
Core

  • Guided, graded software exercises in the BIM tool(s) specific to the course's theme (authoring, coordination, scheduling, analysis, or FM platforms), building toward a cumulative course deliverable
  • Practice aligned with vendor or industry certification exams (Autodesk Certified Professional, buildingSMART openBIM) relevant to the course's software focus

Learning Outcomes:
Core:

  1. Describe the practicum structure for the course's BIM software focus and the deliverable it builds toward [Familiarity]
  2. Complete a sequence of guided exercises in the course's BIM software focus, building toward a cumulative practicum deliverable [Usage]
  3. Evaluate the student's own practicum deliverable against the software proficiency expected for the course's BIM theme [Assessment]